1.1 Features
Compliant with Universal Serial Bus 3.0 Specification Revision 1.0, which is released by USB Implementers Forum, Inc
- Supports the following speed data rates as follows: Low-speed (1.5 Mbps) / Full-speed (12 Mbps) / High-speed (480 Mbps) / Superspeed (5 Gbps)
- Supports USB 3.0 link power management (U0/U1/U2/U3)
- Supports USB 2.0 link power management (LPM: L0/L1/L2/L3)
Configurable downstream port counts of 2, 3, or 4 ports
Supports all VBUS control options
- Individual or global over-current detection
- Individual or ganged power control
Supports USB 3.0/2.0 Compound (non-removable) devices by I/O pin configuration
Supports clock output (24/12 MHz) for Compound (non-removal) device on downstream ports
Supports Energy Star and EuP specifications for low-power PC peripheral system
Single 5 V Power Supply
- On chip LDO for 3.3 V from 5 V input and Switching Regulator for 1.05 V from 5 V input
System clock: 24 MHz Crystal or Oscillator
Supports USB Battery Charging Specification Revision 1.2 and other portable devices
- DCP mode of BC 1.2
- CDP mode of BC 1.2
- China Mobile Phone Chargers
- EU Mobile Phone Chargers
- Apple iOS products
- Other major portable devices
Supports SPI ROM for optional firmware and parameter data
Small Footprint
- Small and low pin count package with simple pin assignment for PCB layout
- Integration of many peripheral components
- Direct routing of all USB signal traces to connector pins using one layer of the PCB
Self/Bus-Powered modes can be set by pin strapping
Integrated termination resistors for USB
Provides SUSPEND status output
Supports Port Indicator control (only Green color)
1.2 Applications
Stand-alone Hub, Monitor-Hub, Docking Station, Integrated Hub, etc.
Request a quote UPD720210K8-BAF-A at censtry.com. All items are new and original with 365 days warranty! The excellent quality
and guaranteed services of UPD720210K8-BAF-A in stock for sale, check stock quantity and pricing,
view product specifications, and order contact us:sales@censtry.com.
The price and lead time for UPD720210K8-BAF-A depending on the quantity required, please send your request to us,
our sales team will provide you price and delivery within 24 hours, we sincerely look forward to cooperating with you.
我们高度重视您的反馈意见。请分享您最真实的评价。
*请在发表评论之前登录您的帐户